Catherine Creek Townley Dobbin Fish Passage

  • GRMW ID: 1827
  • Fiscal Year: 2009

The project proposes to replace the channel-spanning Townley Dobbin diversion structure on Catherine Creek and install a bypass fishway. Catherine Creek is habitat for ESA listed Snake River summer steelhead, summer Chinook and bull trout as well as resident rainbow and other native fish. The existing water diversion structure is a channel-spanning, deteriorating concrete wall on which check boards are placed to divert irrigation water into the Townley Dobbin ditch on the north side of the channel. The structure is a complete barrier to juvenile salmonids and other resident fish after diversion boards are installed, usually sometime in July.

Documents

Document
Completion Report View
Project Proposal View
Line Item Budget View

Contacts & Roles

Name Role Organization
Lyle Kuchenbecker Technical Contact Grande Ronde Model Watershed
Mary Estes Administrative Contact Grande Ronde Model Watershed

Organizations

Organization Role
Bonneville Power Administration Funding Entity
Grande Ronde Model Watershed Sponsor

Grants & Contracts

Organization Contract # Funding Amount
Bonneville Power Administration 00042743 $89,250.00

Project Points

Site Description Latitude/Longitude Link to KML
Diversion Structure 45.2108507363 / -117.868401195 Download KML
J-hook Rock Vane 45.2112130117 / -117.868971704 Download KML